Civil Engineering

New construction station area, Gersthofen



Client
Stadt Gersthofen


Programming period
2012 - 2018


Volume of investment
1,64 Mio. €

Scope of service

The project comprised the planning of a Park & Ride facility between Westenstraße and west of the railway line. The planning task consisted of extending Westendstraße, planning a new access road and 94 new parking spaces directly adjacent to the tracks. This construction project serves to strengthen the local public transport system and to improve the parking situation at Gersthofen railway station. The total area of the construction project is approx. 7,200 m². The length of the main roadway is approx. 450 m, the total length of the asphalt roadway approx. 540 m. The width of the tramline is 6.00 m throughout and is also suitable for public transport buses. The rainwater is percolated on site. A total of 94 parking spaces have been constructed, 4 of which are intended for disabled parking. The parking areas were paved with grass joint pavement.

  • Upstream development plan procedure
  • Project planning of traffic facilities according to HOAI, work phases 1 - 9
  • Project planning of civil engineering structures according to HOAI, work phases 1 - 9
  • Surveying
  • Geotechnical and soil mechanical exploration

Your contact person

Bernhard Betzl
Teamleader Civil Engineering

Bernhard.betzl@klingconsult.de