Architecture

Development of Derching West industrial estate, Friedberg



Client
Stadt Friedberg; Stadtwerke Friedberg


Programming period
2008 - 2011


Volume of investment
4 Mio. €

Scope of service

The Derching industrial estate is located on the western outskirts of Derching, north of the A 8 Munich - Stuttgart motorway. The road cross-section basically consists of 2 lanes, an adjoining drainage trough and a 2.5 m wide footpath and cycle path. The road widths vary between 3.50 m and 5.25 m (2 lanes incl. turning lane). Drainage is carried out via the drainage trough that accompanies the road with a width of 1.5 m as well as the infiltration ditch below. In the course of the planning, Kling Consult carried out the necessary as-built surveying, the necessary subsoil investigations, the planning of the outdoor facilities as well as the planning of the necessary compensatory measures and the general preliminary examination according to § 3c UVPG.

  • Planning coordination Overall measure
  • Project planning of traffic facilities according to HOAI, work phases 1 - 9
  • Project planning of engineering structures according to HOAI, work phases 1 - 9 (trough-trench infiltration, combined sewer, water supply)
  • Local construction supervision
  • Health and safety coordination
  • Subsoil investigation and assessment
  • Surveying inventory

 

Your contact person

Andrew Spearpoint
Teamleader Architecture

andrew.spearpoint@klingconsult.de