Architecture

New construction of chemical production plant, Waldstetten



Client
Chemische Fabrik Karl Bucher GmbH


Programming period
2014 - 2018


Volume of investment
4,8 Mio. €

Scope of service

The new 30 meter high tower in massive concrete construction consists of seven floors and contains a plant for the production of hexamethyldisiliazane (HMDS). In order to optimally adapt the building to Bucher's needs, we worked closely with the chemical specialists. The challenge was that for production reasons the new building had to be built directly adjacent to the existing plant. On the other hand, the tank farm for ammonia (NH3) was arranged as a free-standing structure at the edge of the plant site to be easily accessible for truck traffic.

  • Object planning building according to HOAI, Lph 1 to 8
  • Structural design according to HOAI, Lph 1 to 6
  • Technical building services (HLS/ELT) according to HOAI, Lph 1 to 8
  • Geotechnical and soil mechanical exploration
  • Health and safety coordination
  • Fire protection
  • Survey
  • Initial Status Report
  • Integrated planning / coordination of plant engineering

Your contact person

Andrew Spearpoint
Teamleader Architecture

andrew.spearpoint@klingconsult.de