Architecture
New Construction Eurohotel Derching-West, Friedberg

Client
lu.pe GmbH & Co. KG

Programming period
2014 - 2015

Volume of investment
3 Mio. €
Scope of service
The main criteria of economy and flexibility determined the architectural design. The design of the hotel rooms fully meets the client's requirements: Rationally arranged "back-to-back" arrangement of the guest bathrooms as well as an efficient solid construction (bulkhead construction) were the core issues of the planning optimization, which allowed the development of the clearly structured floor plans characteristic for a hotel. The standard grid resulting from the room size was applied throughout the entire building. The colour concept is based on the established company CI of the client.
- Object planning building according to HOAI, work phases 1 - 9
- Technical expansion planning and fire protection
- Project planning of traffic facilities/engineering structures according to HOAI, work phases 1 - 4
- Structural design according to HOAI, work phase 3
- Project planning of open-air facilities according to HOAI, Lph 1 to 9
- Geotechnical and soil mechanical exploration
- Site management