Architecture

New office construction T35 in modular design, Ingolstadt



Client
Audi AG, Ingolstadt


Programming period
2010 - 2012


Volume of investment
25 Mio. €

Scope of service

Due to the location of the construction project on the edge of existing streets and buildings, it was a "building in existing contexts". The adjacent access road had to be freely accessible at all times. An existing filling station and an existing elevated roadway (supply and disposal lines) had to be integrated into the outdoor facilities.

  • Object planning according to HOAI, work phases 1 - 9
  • Open space planning according to HOAI, work phases 1 - 9
  • Structural design according to HOAI, work phases 1 - 6
  • Technical building services
  • Thermal building physics
  • Sound insulation/room acoustics
  • Design Surveying
  • Fire protection
  • Health and safety coordination
  • Drainage planning for the building application
  • Subsoil consulting

 

Your contact person

Andrew Spearpoint
Teamleader Architecture

andrew.spearpoint@klingconsult.de